ENERGY SELF-SUSTAINING AND ENVIRONMENTAL FOOTPRINT REDUCTION ON WASTEWATER TREATMENT PLANTS VIA FUEL CELLS (BIOCELL)
Biocell Life
2009 © Copyright Biocell.
All rights reserved.
Read General conditions.
ACCESS TO
RESTRICTED AREA
OBJECTIVES

The goal of the BIOCELL project is to demonstrate the feasibility and economic viability of energy production from biogas via both PEMFC and SOFC fuel cells adapted to WWTP, and develop the adequate tools for its industrial implementation and the assessment of its environmental impact.

EXPECTED RESULTS:

  • Operation and optimisation of pilot plants energy production on WWTP from biogas via PEMFC and SOFC fuel cells.
  • Recommendations on choice, implementation, operation and optimization of energy production from biogas via fuel cells adapted to WWTP.
  • Assessment of energy, economic and environmental balance of WWTP using biogas recycling via fuel cells.
  • Assessment of the application field of fuel cells on WWTP.  

BUDGET:

  • The BIOCELL budget is 2,4 million euros.

DURATION:

  • The duration of the project is expected for three years.

    START DATE
    : 01/01/2009
    END DATE: 31/12/2011

 

04/06/2010
THE BIOGAS TREATMENT FOR THE SOFC PLANT IS CONSTRUCTED
The biogas treatment part of the SOFC pilot plant was constructed from the 27th May to the 4th June 2010. The following...
26/02/2010
CONFERENCE ON ENERGY EFFICIENCY
On November the 26th, ESAMUR (Murcia, Regional WWT Entity) organized a conference about Energy Efficiency. EMUASA took part on...
23/02/2010
FUEL PROCESSOR
Fuel processor: The basic engineering, which defines the equipments, flow compositions and required services (air, water and...
08/02/2010
ACTIONS 2 AND 6 PROGRESS
The Basic Engineering of the Biogas Reforming Unit has been developed. The different pieces of equipment, operating conditions...
15/01/2010
ACTIONS 4 AND 5 COMPLETED
The project partners have decided to implement a biological desulphurisation and final polishing (refrigeration and adsorption...
15/12/2009
BIOCELL PROGRESS III
The 3rd coordination meeting was held in Paris (CIRSEE headquarters) on the 15th of December 2009.
28/05/2009
BIOCELL PROGRESS II
The second coordination meeting was held at Murcia (Murcia Este WWTP) on 28th of May 2009.
28/05/2009
BIOCELL WORKSHOPS
A biogas treatment workshop was held at Murcia on the 28th of May 2009. Project partners assessed different biogas treatment...
23/04/2009
WASTE WATER TREATMENT PLANT SELECTION IN CATALONIA
After a pre-selection of 4 wastewater treatment plants in Catalonia, a comparative study of the latter led to the selection of...
13/01/2009
BIOCELL PROGRESS I
The kick-off meeting for the BIOCELL project was held at Barcelona (Agbar Tower) on the 13th of January 2009.